WEATHERMODELS.COM  |  MOGREPS-G  |  UK MET OFFICE MOGREPS-G · 6-HOURLY TO 240 H
Forecast hour
F00
F00
——
Speed
DRAG THE BALL OR CLICK A TICK · SPACE TO PLAY · ← → TO STEP · [ ] CHANGE CYCLE · L LAGGED RUNS · P SAVE PNG
Save loop
Save image
[PREVIOUS MOGREPS FORECAST CYCLES]

MOGREPS-G Ensemble [36 members]

VIEW
MAP
LOOP
SPEED:

Information
  • UK Met Office MOGREPS-G ensemble maps every 6 hours to 10 days (F240), from the 18 members of each run pooled with the 18 of the run 6 hours before (36): the ensemble mean, spread, lowest member, percentiles and probabilities, daily highs and lows by local solar day, and anomalies against the ERA5 / CFSR normals. A cycle is published 6.5-8 hours after its time; this page picks up new hours by itself.
  • LAGGED (6 RUNS) shows the current run beside the five before it, all valid at the same time: how the forecast for that moment has changed run to run.
  • SAVE LOOP makes an MP4 or GIF of what you are looking at, for all the frames or just a range, in your browser; SAVE IMAGE saves the map on screen, or the six lagged runs on one PNG. Nothing is uploaded.
  • A service of weathermodels.com. The maps are created from the UK Met Office MOGREPS-G ensemble (36 members: this run's 18 and the 18 of the run 6 hours before), 0.25°.